26 Apr Audi, Modesto
New automotive showroom and Service building....
New automotive showroom and Service building....
Hilltop Volkswagen is the latest in Design from the Auto Group. The new showroom facility and remodeled service department is approximately 22,000 square feet sitting on approximately 3 acres of land. ...
Walter’s Smart Car facility was one of the first Smart Car franchise’s in the Nation. The building is approximately 7,000 square feet and was remodeled into the Manufacturer’s design idiom. ...
Walter’s Porsche / Audi consists of approximately 65,000 square feet of new Audi Showroom and a combined Porsche / Audi service departments, separated by a common service drive. Due to the smallness of the site, a concrete “Podium” deck was used to provide the required...
Toyota 101 is a two story podium structure of approximately 90,000 SF of area. The building will replace the existing facility. The bottom floor will contain the showroom, offices, service drive, 20 service bays Tech area, car wash and ramp to the roof deck. The...
Thompson Toyota is a remodel and expansion of the existing dealership. The renovation included the removal of and replacement of the existing mansard type roof to meet Toyota’s Image II program. Additional showroom area was added to the footprint by utilizing the covered exterior display...
Serramonte Ford is a Remodel-Expansion of the existing dealership which was originally built in 1971. Site area is approximately 7 acres and is near the San Francisco International Airport (SFO). The showroom and parts building are being expanded and remodeled to meet Ford’s Image program...
Michael Toyota was originally designed by R.L. Davidson, Inc., in 1988, and recently remodeled and expanded to meet the Image II program. The total building area is approximately 48,000 square feet and sits on almost 7 acres. ...
Michael Chevrolet is a new facility meeting the new GM standards of approximately 7,000 of showroom and sales areas. The building was constructed upon determination the older existing structure could not withstand the new engineering load requirements. The service drive/department and customer waiting area, to...